Polarization Index Testers

A PI tester (Polarization Index Tester) is a specialized insulation testing device that can be used to reliably assess the condition of electrical insulation—particularly in motors, generators, transformers, and other high-voltage equipment.

The device operates using the Polarization Index (PI) method, in which the dielectric strength is measured and analyzed over a defined period of time. The insulation resistance is recorded at several time points—typically after one minute and after ten minutes—and the PI value is calculated from the ratio of these values.

To assess the condition over longer periods of time, measurements can be taken at regular intervals, such as quarterly, semi-annually, or annually. If the PI value decreases over time, it is recommended to shorten the testing intervals in order to respond promptly to potential insulation damage.

The PI value is a reliable indicator of:

  • Moisture in the insulation
  • Contamination or aging
  • Surface conductivity

Key Facts:

  • Meaningful assessment of insulation quality
  • Temperature-independent evaluation
  • Early detection of moisture, contamination, or aging
  • Ideal for preventive maintenance and condition monitoring
  • Automated measurement procedures with integrated PI calculation

MotorAnalyzer1

The entry-level model for your engine service

CHECK YOUR MOTOR'S HEALTH!

For electrical machine manufacturers
For electric motor repair
For maintenance, servicing, and support

• Asynchronous, synchronous, and DC motors, brakes, transformers, coils …
• Troubleshooting and fault location
•PI and DAR testing – Motor condition testing
• And much more …

• Lightweight and portable

• Offline operation
• PC software for printing and save

View Product

MotorAnalyzer3

The mobile all-in-one professional model for your engine service

CHECK YOUR MOTOR'S HEALTH!

For electrical machine manufacturers
For electric motor repair
For maintenance, servicing, and support

Key testing methods

  • surge test – 3 kV
  • Resistance test
  • Insulation Resistance Test – 6 kV
  • high voltage test DC – 6 kV
  • Polarization index, DAR – 6 kV
  • inductance
  • impedance
  • Capacitance
  • turn-to-turn fault localization with a probe
  • Adjustingthe Neutral Zone
  • sense of rotation and sense of rotation
  • …
  • Off-grid operation
  • PC software for printing and save
  • Communication with
    «» PC via Bluetooth

View Product

MTC2 R7

Universal winding testers from 6 to 50 kV

For production, EOL, and automation
For test labs, R&D, approval, and regulatory testing
For repair, maintenance, and service

  • sense of rotation Determine using a measuring probe in the stator
  • rotating field Determine by manually rotating the motor shaft

surge test

  • Ultra-fast 50 measurements per second
  • Comparison of phases with one another
  • Patented peak-to-peak measurement

Partial discharge in accordance with surge test in accordance with DIN EN 60034-18:2014

  • Passive or active antenna
  • Wired extraction

ohmic resistance

  • Winding
  • temperature sensor

insulation resistance

  • IR
  • PI, DAR

High-voltage AC (optional)

Test terminals

  • Default: 4
  • Optional: 7 or more

View Product

Good to know:

The Polarization Index Test

A PI tester is used to accurately assess the insulation quality of electrical machines—such as motors, generators, or transformers. It measures the so-called Polarization Index (PI), a parameter that provides insight into the condition of the insulation.

How it works

  • Measurement principle

The tester generates a constant DC voltage (typically 500 V to 5 kV) and measures the insulation resistance after 1 minute (R₁) and 10 minutes (R₁₀)

  • Calculation
  • The PI value is calculated as the ratio of R₁₀ to R₁.

 

Interpretation of the values

PI value

Statement on Isolation*

< 1,0

Critical – severe impairment

1.0–2.0

Borderline – further analysis recommended – action is needed

2.0–4.0

Good – Insulation in good condition

> 4,0

Very good – dry, clean insulation

* These are approximate values and are provided without warranty. For further specifications, please refer to the relevant standards (e.g., IEEE 95-1977).

Long-term monitoring using PI testing

To assess the condition of electrical insulation over extended periods, regular PI measurements are recommended—for example, annually, semi-annually, or quarterly.

If the PI value decreases over time, the test interval should be shortened to allow for an early response to potential insulation damage.
If the PI value reaches a critical level space, preventive maintenance may be advisable.

This helps prevent unplanned downtime and allows maintenance or repair work to be scheduled during specific, predictable time slots—such as during company holidays or periods when production is not taking place.

Typical applications

  • Maintenance and Repair of Electrical Machines
  • Pre-diagnosis Commissioning
  • Quality Assurance in Manufacturing

Advantages

  • More informative than individual measurements of insulation resistance
  • Automated measurement procedures with integrated PI calculation
  • Documentation and analysis via interfaces are possible

The SCHLEICH Product Portfolio – Expect More!

Insulation, PI, and DAR testers

 
  • TEST VOLTAGE from 30 V to 50,000 V DC
  • Standard-compliant test voltage waveforms over time
  • Often used in combination with other test methods such as high-voltage DC/AC testing, step-voltage testing, surge test, partial discharge measurement, etc.
  • Standard interfaces such as RS-232, Ethernet/LAN, and USB for communication with a PC
  • 24 V digital I/O for communication with the PLC
  • Expandable to Industrial Ethernet and fieldbus systems for PLC communication
  • Virtually unlimited storage space for test plans and test results
  • All parameters are set via the software

Custom testing equipment and systems

 
  • Single-function and combination testers
  • Automatic testers/test systems with a relay matrix
    (2, 3, 4, 6, 9, 12, 15, 18, 21 … 100 terminals)
  • Complete testing stations
  • Production lines with transfer systems
  • EOL workstations
  • Large-scale facilities

Comprehensive service

 
  • Professional consulting backed by expert knowledge
  • Careful initial startup
  • Regular certified calibration
  • After-sales support from our service team
  • Service by phone, via remote support, or on-site
  • Customized training programs
  • SCHLEICH.CARE.PREMIUM

Do you need personalized product advice?

We'd be happy to provide provide you with comprehensive support and advice on all our products and services.
Give us a call or send us an email!

  • Subscribe to the SCHLEICH newsletter

    Our free newsletter—delivered straight to your inbox.

  • Fields marked with * are required.

"*" indicates required fields

Contact Form

Fields marked with * are required.
Accepted file types: pdf, jpg, jpeg, Max. file size: 10 MB.
  • These are only uncompressed JPG/JPEG and PDF files is permitted.
  • The maximum file size is 10 MB.
Privacy Policy*