| |
Testmethods OverviewLeakage Current |  | The leakage current test can be carried out at devices of the protectio....
more |
Arc-Detection |  | The Arc-Detection test has the distinction of detecting the micro-discharge in a partial part of the insulation clearance at an early stage. The micro-discharge in one part of the insulation system will in the course of time lead to a more and more increasing damage spot. After hours, days, weeks, months or years the insulation system is weakened due to the persisting micro-di....
more |
Sense of Rotation |  | The sense of rotation test is performed at electric motors. The test can be carried out at a completely assembled motor as well as at a stator.The test at the motor is realised with different numbers of rotation-sense - rotation sensors. For example reflection light barriers or encoder can be used.The test at the stator is carried out wi....
more |
Substitute-Leakage Current |  | It is checked if through the insulation the leakage current is below a limit value determined by the standards. The test is carried out according to various national and international regulations.
more |
Function 1- / 3-phase |  | At the functional test the electrical and, if required, the mechanical and physical characteristics of the device to be tested are measured and evaluated. For this purpose, the device is usually operated under operating conditions. I.e. the tester supplies the device with a test voltage.This test voltage can come directly from the mains, via an isolating transfo....
more |
Functional Test 1-Phase |  | At the functional test the electrical and, if required, the mechanical and physical characteristics of the device to be tested are measured and evaluated. For this purpose, the device is usually operated under operating conditions. I.e. the tester supplies the device with a test voltage.This test voltage can come directly from the mains, via an isolating transfo....
more |
High Voltage AC |  | The high-voltage test AC (alternating voltage) serves for testing the electric insulation capability and voltage proof of clearance and leakage paths at electric components, modules, machines, devices and systems according to various national and international regulations. The level of the test voltage, the duration of the test, the type of test and the maximum ....
more |
High Voltage DC |  | The high-voltage test DC (direct voltage) serves for testing the electric insulation capability and voltage proof of clearance and leakage paths at electric components, modules, machines, devices and systems according to various national and international regulations. If the standard allows it, the high-voltage test DC can be used as an alternative to the high-v....
more |
Inductivity |  | The inductivity can be measured and evaluated with various methods. For an automatic evaluation the set value of the inductivity and the allowed +- tolerance is given. Which testers does SCHLEICH supply?
more |
Insulation Resistance |  | The insulation resistance test can be performed at devices of protection class I as well as protection class II. It is checked, whether the ohmic insulation resistance exceeds the limit value laid down in the standards. The test is to detect, whether too high leakage currents could occur in the test object.
more |
Capacity |  | The capacity can be measured and evaluated with various methods. For an automatic evaluation, the set value of the capacity and the allowed +- tolerance is given. Which testers does SCHLEICH supply?
more |
Power-Path Measurement |  | The power-path measurement is a measurement of the power progress depending on a path. A typical power-path procress would be the one of a mechanic spring.Springs are often used in electric products like switches, contactors, relays, solenoids, etc.A at power-path measurement the path is specified by the tester or the product itself. Either t....
more |
Short circuit |  | In principle the short circuit test is an ohmic resistance measurement. This test is usually carried out automatically before an electric functional test in order to find out if there is a short circuit between the conductors. With this it should be avoided that voltage is swichted to a test object which already has a major short circuit. Thus a major damage of the test object can ....
more |
Mathematical Test |  | The mathematical test is a calculation of values, which are based on the measured results of preceding test steps. The user can freely enter these calculations. Thus you yourself can integrate calculation test steps into a test process.The calculation takes place within a mathematic test step.The value calculated within the test step is....
more |
Matrix / Matrices |  | A matrix can be used at single as well as at combination testers.Matrices increase the number of standard measuring lines of the tester to the quantity required by the tester.The advantage is that the test object has to be connected completely only once before the test. Afterwards all measurements run completely automatically between the test points.We supply testers with u....
more |
Mechanical Dimension |  | At this test, the operator uses an electronic caliper gauge to check whether certain dimensions are OK. By directly reading out the measured value from the caliper gauge, the test result is transmitted to the testing device. This can be done, for example, by depression of key. Various start options are available.Depending on the testing device, the testing ....
more |
Multiple Stations |  | It often occurs that a tester is connected to more than one test station. In order to operate double or multiple stations it has to be safely switched between the single stations. During the period when one ....
more |
Neutral Zone |  | The neutral zone is detected at armatures. At armatures it is tested, whether the armature winding is in the correct angular offset to the collector or to the collector lamella respectively. At an assembled DC motor or generator it is checked, whether the brush holder has the correct angle.The test is extremely fast. This is one of many extraordinary featur....
more |
Standard Surge Impulse |  | The standard surge impulse (f.e. 1.2/50μs) test is another alternative to the high-voltage test AC and/or DC. At this the standard surge impulse test rather corresponds to a lightning impulse voltage.The standard surge impulse has a temporal definition of the waveform. Thus it is also often named as 1.2/50 impulse. With both time values the increa....
more |
Physical Values |  | For the physical test, physical signals are converted into electrical signals. Afterwards, they are measured and automatically evaluated. There are many different physical values that can be used:temperaturepressurevibrationr.p.m.torquelengthpulse repetitionetc.
more |
Polarisation-Index | PI |  | At electric machines the polarisation index is a very important measured variable to determine the quality and deterioration of the insulation, which occurs with increasing age of an electric motor.Polarisation is defined as ability of the charge carrier located within the insulator to rotate and adjust to the electrical field - i.e. to polarise. The o....
more |
Test Method Switchover |  | A test method switchover is only needed at combination testers.The test method switchover makes sure that the measuring connections of the s....
more |
Residual Voltage |  | The residual-voltage test serves to detect the residual voltage at various touchable connections of the test object according to standards. According to the standards the level of the residual voltage is measured after a certain time. Residual voltages occur, for example, inside the test object through charging.
more |
PE Resistance |  | The PE test is performed at devices of protection class I. It is checked, whether the PE resistance is below a limit value defined in the standards. The test is to detect whether possible leakage currents inside the test object are grounded correctly. If the PE connection is not OK, this could result into a too high touch voltage at exposed metallic parts of the dev....
more |
Visual Check |  | At a visual check the operator controls the test object visually. Afterwards the test result is entered into the testing device. For this normally an operating panel with "GO" / "NO GO" button is used. For entering the result various options are available. Depending on the type of tester, the testing task can be displayed in clear text or as ....
more |
Surge Test |  | The surge voltage test is ideal for detecting winding shorts and insulation faults within a winding. No other test method is able to deliver test results on the insulation of a winding system of a similar quality.This test can also be extended by a partial-discharge test.Especially due to the automatic evaluation methods of the test results, this tester is ideally s....
more |
Partial Discharge Surge / HVAC |  | A characteristic of the partial discharge is that not the complete isolating distance breaks down but only a part of it. But in the course of time these partial discharges in a part of the isolating system will lead to an increasing defect. After hours, days, weeks, months or years, the isolating system will be impaired to an extent that you will have a complete disruptive breakdow....
more |
Inductive Resistance |  | The inductive resistance can be measured and evaluated by means of various methods. For an automatic evaluation, the set value of the resistance set value and the allowed +- tolerance is given. Which te....
more |
Ohmic Resistance |  | The ohmic resistance is measured and evaluated. For an automatic evaluation, the set value of the resistance and the allowed +- tolerance is given.The resistance test can be performed with the two-wire measurement as well as with the high-accuracy 4-wire meas....
more |
Turn-To-Turn Test |  | The turn-to-turn test can be performed together with the surge voltage test or with a turn-to-turn test probe. With the MotorAnalyzer or the surge testers MTC2 and MTC3 turn-to-turns can be detected ideally. The turn-to-turn test is ideal for detecting shorts and insulation faults in windings. No other test method delivers test results on the insulation of a winding s....
more |
Turn Counter |  | The number of turns is measured at a coil or at a part of a coil. Which testers does SCHLEICH supply?
more |
|
|